From: Michael Hall
<mghall@topeka.org>
Sent: Tuesday, September 28, 2021 10:19 AM
To: Kevin Holland <kholland@cfse.com>; Henry McClure
<mcre13@gmail.com>
Subject: Rezoning of Gordmans Site
Here is the
recommendation I received from our traffic engineer.
From:
Jussel, Jim <JJussel@benesch.com>
Sent: Tuesday, September 21, 2021 6:16 PM
To: Michael Hall <mghall@topeka.org>;
Kristi R. Ericksen <kericksen@topeka.org>;
Annie Driver <adriver@topeka.org>
Cc: Johnson, Brad <BJohnson@benesch.com>
Subject: RE: Potential Truck Traffic
Kristi and Mike
You could have the
applicant complete the trip generation memorandum that would compare the
current land use (commercial) to the new land use (warehouse) to provide you a
better estimate of the increase in the traffic. I would recommend that
the memo include the truck numbers as well and a brief description of the
proposed site, including access points. You can stipulate that this memo
does not replace the need for a TIA but would be used to help define the scope
of the TIA or if it is needed. Just some thought. Let me know if
you have any questions.
Thanks
Jim
|
Jim Jussel, PE, PTOE
Traffic
Group Manager | Associate
jjussel@benesch.com
direct: 913-213-5162 mobile: 913-690-3919
office: 913-441-1100
|
|
|
From:
Michael Hall <mghall@topeka.org>
Sent: Tuesday, September 21, 2021 4:56 PM
To: Kristi R. Ericksen <kericksen@topeka.org>;
Annie Driver <adriver@topeka.org>
Cc: Jussel, Jim <JJussel@benesch.com>;
Johnson, Brad <BJohnson@benesch.com>
Subject: RE: Potential Truck Traffic
Thanks
Kristi.
More
questions:
1.
Considering that the building is already built and zoned for retail use, I
don’t suppose we would require the owner to provide a TIA before converting the
building to warehouse – am I correct in this assumption? Conversion
to a warehouse will change the nature of traffic (trucks versus cars) but not
likely to increase volume, I suppose.
2. As
a condition of the PUD zoning, can we require the applicant to start by
providing us with the trip generation #s – as an alternative to a TIA?
Sorry to
bug you about this – but I want to address this right up front and not wait
until after they apply for the zoning change.
Mike Hall, AICP
Manager, Current
Planning
City of Topeka
785-368-3007
From:
Kristi R. Ericksen
Sent: Monday, September 20, 2021 7:02 AM
To: Michael Hall <mghall@topeka.org>;
Annie Driver <adriver@topeka.org>
Cc: Jussel, Jim <JJussel@benesch.com>;
Johnson, Brad <BJohnson@benesch.com>
Subject: RE: Potential Truck Traffic
Yes and yes.
Always part of the TIA. My Trip Gen is not the latest (and I don’t have it here
at home) and so the applicant will need to do that. Plus, I wouldn’t normally
do that work for them anyway, even if I had the correct information.
IMHO, the
answer to the question about residential truck traffic is: none. It’s a pain to
get out of that neighborhood compared to the signal on Topeka. Any deriver that
does it once won’t do it twice, LOL.
If a TIA is
required, I would have them include a signal warrant analysis for the Topeka
signal. I think that removing the signal would not benefit the developer and I
am not likely to pursue that course, but it is important that I know the
status.
Does that
help?
Kristi
Ericksen
Traffic
Engineer
City of
Topeka
785-861-9848
From:
Michael Hall <mghall@topeka.org>
Sent: Wednesday, September 15, 2021 10:11 AM
To: Kristi R. Ericksen <kericksen@topeka.org>;
Annie Driver <adriver@topeka.org>
Subject: Potential Truck Traffic
I have some
questions you can probably help me with.
We have a
pre-app meeting next week for a potential rezone of the Gordman’s building on
SW Topeka Blvd – to allow conversion to a warehouse. The building
has 90,250 sf. Does the ITE manual provide an estimate of the range of
truck traffic volume for this size and type of building? Is there a
way to estimate, from the total volume of truck trips, what percentage of those
trips are likely to go west on SW Fillmore Street and then drive through the
residential neighborhood?
Mike Hall, AICP
Manager, Current
Planning